Bedford Strategies and Solutions | The Bottom Line | May 2011
The Bottom Line

Future Events

5/25/11: 1031 Exchange and
Depreciation Recapture
(1 CPE Credit)


6/15/11: Cost Segregation
Basics(2 CPE Credits)


6/29/11: Cost Segregation
and Change in Accounting
(2 CPE Credits)






Meet the Team

Greg Roberts, ME, CPE, CCSP
Dir. of Engineering Services

Greg Roberts, ME, CPE, CCSP,
With Bedford Since 2002.





         Follow Us on Twitter!





As a loyal subscriber to Bedford's newsletter, we appreciate your dedication to receiving our educational, yet often technical articles. In light of the end of a very busy tax season, we have decided to stray from the norm and offer you some insight into a project site visit as experienced by a Bedford engineer.


Feature Article

And now for something completely different
By Greg Roberts, ME, CPE, CCSP

While most people think that an engineer conducting a site visit is about as exciting as watching to paint dry, let me assure you it can be anything but dull.

Some time ago, a client of ours gave us the opportunity for a wonderful project in Ft. Lauderdale, Florida – right when spring break was in full swing. The prospect of leaving a snow-covered, frozen New Hampshire was exhilarating and I jumped at the opportunity. Clothes were packed, golf clubs polished and travel arrangements made.

Read More >>  

Latest News

American Society of Cost Segregation Professionals 2011 MQS Now Available for Purchase.

Issues Regarding Application of 100% Bonus Depreciation and Revenue Procedure 2011-26


Special Webinar Event! 45L and 179D for the Multifamily Market - June 7, 2011.


Featured Project

We have completed a cost segregation study on a newly constructed mixed-use Office/Warehouse. The property had a total cost basis of $4,744,250.

Our cost segregation study accelerated $355,819 of the assets into 5-year property and $1,935,654 into 15-year property.

As a result, our client is expected to receive over $491,000 in NPV savings over the next 10 years with over $472,000 available for the current tax year.


     Copyright 2011 Bedford Cost Segregation, LLC

    
     * Estimate of first year savings based on a 40% tax rate.
     ** Estimate of 10-year net present value savings based on a 40% tax rate and 8% discount rate.


Sustainability Cost Segregation Capital Solutions Share this with a colleague! Bedford Strategies and Solutions Bedford Capital Solutions Bedford Cost Segregation Bedford Sustainability Solutions